Pool Planning Checklist

Pool Planning Checklist

Your Complete Dubai Villa Pool Installation Guide

Bookmark this comprehensive checklist to ensure your pool project runs smoothly from planning to completion


PRE-PLANNING PHASE (2-3 months before construction)

❏ Initial Budget Planning

  • Set realistic budget range: AED 60,000 - 300,000+ depending on size/features
  • Factor in additional costs: permits (AED 10-20k), cooling systems (AED 15-20k)
  • Reserve 10-15% contingency fund for unexpected site conditions
  • Consider long-term costs: maintenance (AED 500-1,000/month), utilities

❏ Site Assessment

  • Measure available garden space and identify optimal pool location
  • Check for underground utilities (water, electricity, internet cables)
  • Assess machinery access - can excavators reach the planned location?
  • Consider sun exposure patterns and privacy from neighbours
  • Evaluate drainage and water table conditions

❏ Design Considerations

  • Pool Size: Popular Dubai sizes: 6x4m, 8x4m, 9x5m
  • Pool Type: Concrete (max customisation), Fiberglass (faster install), Vinyl (budget option)
  • Depth Requirements: Standard 1.0m shallow, 1.4-1.5m deep end
  • Special Features: Infinity edge (+20-50% cost), water features, integrated spa
  • Pool Decking: Marble, natural stone, anti-slip materials

CONTRACTOR SELECTION PHASE

❏ Research Verified Contractors

  • Check Trusty Verified Experts: Pools by Design, Secret Gardens
  • Verify Dubai Municipality approval and licensing
  • Request portfolio of recent Dubai villa projects
  • Check customer reviews and references from actual clients

❏ Get Multiple Quotes

  • Obtain 3-4 detailed quotes for comparison
  • Ensure quotes include: excavation, materials, labour, permits, basic equipment
  • Ask about timeline estimates (typically 4-6 weeks for standard pools)
  • Clarify what's NOT included: landscaping, advanced lighting, premium finishes

❏ Contractor Evaluation Checklist

  • Experience: Minimum 5+ years in Dubai market
  • Permits: Will they handle Dubai Municipality applications?
  • Communication: Responsive, patient with questions, clear explanations
  • Aftercare: Ongoing support after completion
  • Insurance: Comprehensive liability and worker coverage

PERMIT & APPROVAL PHASE

❏ Dubai Municipality Requirements

  • Submit architectural drawings and pool specifications
  • Pay consultant fees (~AED 6,000) and security deposit (~AED 5,000)
  • Allow 2-4 weeks for the approval process
  • Ensure contractor handles all permit coordination

❏ Community Approvals (if applicable)

  • Check homeowners' association rules for pool installations
  • Verify any restrictions on pool size, equipment placement, or noise
  • Obtain any required community approvals before construction
  • Confirm compliance with building setback requirements

'

CONSTRUCTION PLANNING

❏ Optimal Timing

  • Best months: November - March (cooler weather for construction)
  • Summer planning: Use hot months for design/permit phases
  • Take into Ramadan and mid-summer constraints: Construction may be limited/take longer due to reduced working hours
  • Consider travel: Plan around family holidays/travel periods

❏ Pre-Construction Preparation

  • Clear and protect existing landscaping that will remain
  • Arrange temporary storage for garden furniture/equipment
  • Notify neighbours about upcoming construction activity
  • Ensure clear access route for construction vehicles and materials
  • Set up temporary barriers if children/pets need pool area protection

❏ During Construction

  • Regular progress check-ins with contractor (weekly minimum)
  • Document progress with photos for insurance/warranty purposes
  • Address any concerns immediately rather than waiting
  • Verify quality of materials upon delivery
  • Maintain clear communication channels with the project manager

CLIMATE CONTROL SYSTEMS

❏ Cooling System (Essential for Dubai)

  • Heat Pump Chiller: AED 15,000 - 20,000 for dual heating/cooling
  • Capacity Sizing: Professional calculation based on pool volume
  • Energy Efficiency: Look for high COP (Coefficient of Performance) ratings
  • Installation Planning: Ensure adequate space and ventilation for equipment

❏ Heating Considerations

  • Winter Months: December-February may require heating for comfort
  • Running Costs: Budget AED 6-8/hour for heat pump operation
  • Thermal Covers: Consider covers to reduce heat loss (30-50% savings)
  • Smart Controls: Programmable thermostats for automatic temperature management

MAINTENANCE PLANNING

❏ Equipment Selection

  • Filtration System: Sand vs cartridge filters - discuss with contractor
  • Circulation Pump: Variable speed pumps for energy efficiency
  • Cleaning Equipment: Robotic cleaners, skimmers, brushes, vacuum systems
  • Water Testing: Digital testing kits vs test strips
  • Chemical Storage: Secure, ventilated storage area for pool chemicals

❏ Service Decisions

  • Professional Service: AED 400-600/month for weekly maintenance
  • DIY Maintenance: Chemical supplies budget ~AED 200-400/month
  • Seasonal Adjustments: Increased service frequency during summer months
  • Emergency Support: 24/7 contractor availability for equipment failures

💰 BUDGET BREAKDOWN CALCULATOR

❏ Base Pool Costs

  • Small Pool (6x4m): AED 60,000 - 120,000
  • Medium Pool (8x4m): AED 100,000 - 180,000
  • Large Pool (9x5m+): AED 150,000 - 300,000+
  • Infinity Edge: +20-50% of base cost
  • Premium Finishes: +AED 15,000 - 50,000

❏ Essential Add-Ons

  • Permits & Approvals: AED 10,000 - 20,000
  • Cooling/Heating System: AED 15,000 - 20,000
  • Pool Decking: AED 200 - 800 per m²
  • Lighting Package: AED 3,000 - 15,000
  • Water Features: AED 5,000 - 25,000

❏ Ongoing Costs (Annual)

  • Professional Maintenance: AED 6,000 - 12,000
  • Electricity (pumps/cooling): AED 2,400 - 4,800
  • Chemicals/Supplies: AED 1,200 - 2,400
  • Equipment Repairs: AED 1,000 - 3,000
  • Insurance Addition: AED 1,800 - 2,400

🛡️ SAFETY & INSURANCE

❏ Safety Considerations

  • Pool Fencing: Removable mesh (~AED 4,000) vs automatic covers (~AED 25,000)
  • Non-Slip Surfaces: Essential for pool decking and steps
  • Emergency Equipment: Pool alarms, rescue equipment, first aid kit
  • Lighting: Adequate underwater and deck lighting for evening use

❏ Insurance Updates

  • Notify Insurer: Add pool to home insurance policy
  • Liability Coverage: Ensure adequate coverage for guest accidents
  • Equipment Coverage: Include pool equipment in policy
  • Additional Premium: Budget ~AED 150-200/month for pool coverage

FINAL CHECKLIST BEFORE SIGNING

❏ Contract Review

  • Detailed Scope: Every aspect of work is clearly defined
  • Timeline: Realistic completion date with weather allowances
  • Payment Schedule: Never pay large amounts upfront
  • Warranty Terms: Equipment and workmanship warranties are clearly stated
  • Change Order Process: How additional work/costs will be handled

❏ Quality Assurance

  • Material Specifications: Brand names and quality grades confirmed
  • Inspection Schedule: Regular quality checkpoints throughout construction
  • Completion Standards: Clear definition of project completion
  • Handover Process: Training on equipment operation and maintenance

READY TO START YOUR POOL PROJECT?

Connect with Verified Dubai Pool Experts:

Check Trusty connects you with verified pool installation professionals who understand Dubai's unique requirements:

🏊‍♂️ Pools by Design - Highly rated with 38+ Google reviews "Lewis and the team have really always taken care of me and been efficient with their process" - Marcus Buchanan

🌿 Secret Gardens - 5.0 rating with comprehensive garden integration, “Secret Gardens was amazing all the way through. On time, great communication, and extremely good quality. If you want a high-end bespoke product, then Secret Gardens are the best.” - Ben, Jumeirah Golf Estates

 🍃 Exterior Space Landscape Works - 5.0 rating Elite Expert, “They built a beautiful overflow swimming pool and a BBQ area with a pergola. The quality and finishes are exactly as we saw in the design.” - Amer, The Meadows

Why Choose Check Trusty Verified Experts?

Pre-vetted contractors with proven Dubai experience

Real customer reviews from verified villa owners

Comprehensive service from permits to completion

Local expertise in Dubai's climate and regulations

Ongoing support for maintenance and questions


Bookmark This Checklist & Get Started Today

Save this comprehensive guide and use it throughout your pool planning journey. Each checked box brings you closer to enjoying your dream Dubai villa pool.

Next Steps:

  1. Complete the Pre-Planning Phase checklist
  2. Contact Check Trusty verified experts for quotes
  3. Use this guide during contractor meetings
  4. Keep this checklist handy throughout construction

Your perfect Dubai pool awaits - let's make it happen!